Commercial Journal
Hiring a builder · October 20, 2026
Eight questions that separate a contractor who can run your project from one who can only price it.
Preconstruction · September 15, 2026
Preconstruction puts a reliable price and date on a project while changes are still cheap. Here is what you should receive.
Light industrial · August 11, 2026
What a flex building is, why cold-formed steel suits it, and what to decide for tenants you do not have yet.
Higher education · July 14, 2026
A teaching kitchen is built for watching and taking part. That changes the layout, the equipment and the code conversation.
Technical space · June 9, 2026
When offices and production share a suite, plan the production side first. Its power, air and material flow are hardest to change.
Light industrial · May 12, 2026
Crane capacity, span and hook height shape the steel and the foundations. Settle them before the structure is designed.
Adaptive reuse · April 14, 2026
A change of use brings code upgrades. The structure, the envelope and the utilities decide whether an old building is worth it.
Restaurants · March 10, 2026
The kitchen and its mechanical systems drive the schedule and much of the cost. Design them before you pick finishes.
Delivery methods · February 10, 2026
A GMP caps what an owner pays for a defined scope and returns savings. Here is what is inside one and what can move it.
Delivery methods · January 13, 2026
One contract or two, a price early or a price late. A plain comparison of the main ways a commercial building is delivered.